2019 November Boxing for Concrete
We wanted to have quite a few garden areas concreted on the same day as the level three Castle slab. This month we boxed up the end of...
Castle in the Sky!
A wonderful documentary by Lukasz Termer about our Castle build had its premiere viewing this month. The Palais Theatre in Franklin...
2019 October Laying steel mesh on Level three
An extremely difficult job for two people was lifting steel mesh up three levels. We halved the mesh lengthwise to lessen the weight. We...
2019 Sept. Working around the wet weather.
42 more concrete mixes. We made some little formers for the boxing for the lightwell and the staircase. We lofted the level two slab...
2019 August. Back to Concreting.
First job after the scaffolding is to is to install the winch. We lifted the mixer, all the gravel and cement in buckets and got back to...
2019 June/July. Scaffolding.
The scaffolding and safety rails all around level two took us 18 days over two months.