top of page

2019 August. Back to Concreting.

First job after the scaffolding is to is to install the winch. We lifted the mixer, all the gravel and cement in buckets and got back to the job of concreting the walls which we had left half filled from below. In five days we mixed 71 loads of concrete.


Featured Posts
Recent Posts
Archive
Search By Tags
No tags yet.
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page