top of page

We are starting to build Level One on Castle Phoenix.


Here we are on our first floor slab in March 2014 with our two boys, Timmy and Mokie. They have been on the build with us for the past three years giving us love and encouragement in their own way.

It has been a hard fought battle to get to this point in the build.

To fund the build we have had to go floor and wall tiling together. This job is very hard on the body and hasn't given us much time left over per month to work on the build.

Indeed, tiling is the cause of Francis's current injury of an inflamed tendon in his foot. We are now off work until it heals which means our build has slowed to a halt.

However, as soon as we can we mean to finish our build! This blog is for giving updates on the build as per plan from Level one up.

Featured Posts
Recent Posts
Archive
Search By Tags
No tags yet.
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page