top of page

2020 January CONCRETE DAY!

The final floor slab on the Castle laid this month. To make the maximum use of the concrete pump, we also concreted six areas in the Sculpture garden. We should be good for a while.


Featured Posts
Recent Posts
Archive
Search By Tags
No tags yet.
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page