2019 Sept. Working around the wet weather.

42 more concrete mixes. We made some little formers for the boxing for the lightwell and the staircase. We lofted the level two slab shape onto the driveway so we could place the reo mesh over to cut to shape. We lifted a few cut sheets of mesh to level two using the winch and then brute strength. Whenever it was raining, Francis worked ten days on lining the Ballroom in the basement with little Hebel blocks. He had a session of block cutting. Finally this month we had a big family visit and tour.