top of page

2019 October Laying steel mesh on Level three

An extremely difficult job for two people was lifting steel mesh up three levels. We halved the mesh lengthwise to lessen the weight. We then used the winch to lift each piece to the handrail level. We then pulled it over the handrail and held it above our heads as we negotiated our way through the numerous reo bar uprights. It took us three days. Our first day had to be abandoned because of a huge thunderstorm.


Featured Posts
Recent Posts
Archive
Search By Tags
No tags yet.
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page