top of page

2018 March Three days on the Build.

All we were able to spend on the build this month but we made 26 loads of concrete and filled walls. Even slow progress is still progress!



Featured Posts
Recent Posts
Archive
Search By Tags
No tags yet.
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page