top of page

Battlements Level Two


A very exciting stage was reached this month with the emergence of battlements on the four rooms on level two. The corbels (which are the triangular pieces which hold up the jutting wall above) were hand moulded. The next thing is to form up the arches between the corbels followed by two courses of brickwork.


Featured Posts
Recent Posts
Archive
Search By Tags
No tags yet.
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page