top of page

The Upper Dam


The upper dam has been mostly empty since work started on it in 2014. We have had a 90 mm pipe keeping it drained. Occasionally, the rain overwhelmed this pipe and the dam has temporarily filled. We have drowned a bag of cement, a wheelbarrow and the tractor - the latter proved very costly. We decided to take a couple of weeks to get the dam to a stage where we could let it fill. We finished the overflow, the last promenade wall and the beach wall.


Featured Posts
Recent Posts
Archive
Search By Tags
No tags yet.
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page