top of page

The Upper Dam


The upper dam has been mostly empty since work started on it in 2014. We have had a 90 mm pipe keeping it drained. Occasionally, the rain overwhelmed this pipe and the dam has temporarily filled. We have drowned a bag of cement, a wheelbarrow and the tractor - the latter proved very costly. We decided to take a couple of weeks to get the dam to a stage where we could let it fill. We finished the overflow, the last promenade wall and the beach wall.


Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
  • facebook
  • Twitter Round
  • googleplus
  • flickr

© 2014 Castle Phoenix. Proudly created with Wix.com

bottom of page