top of page

Differing Jobs


We managed to have ten days work on the build this month. Francis bricked three window arches in the front kitchen. We two moved the wooden staircase from the lounge to the patio, Our access is now up onto the back scaffolding. Lastly, we made a start boxing the lounge ceiling as a work platform for the upper lintel which will hold the top storey studio.


Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
  • facebook
  • Twitter Round
  • googleplus
  • flickr

© 2014 Castle Phoenix. Proudly created with Wix.com

bottom of page