top of page

First Windows on Level Two.


After Hope and Veronica went back to Mackay after their visit to us we started bricking the next level. To start we had to waterproof where the external walls would be. Secondly, the profiles had to be bolted to the room centres. Today, Francis is bricking in the second window in the bathroom, which is on the North or back of the build.



Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
  • facebook
  • Twitter Round
  • googleplus
  • flickr

© 2014 Castle Phoenix. Proudly created with Wix.com

bottom of page