First Windows on Level Two.
After Hope and Veronica went back to Mackay after their visit to us we started bricking the next level. To start we had to waterproof where the external walls would be. Secondly, the profiles had to be bolted to the room centres. Today, Francis is bricking in the second window in the bathroom, which is on the North or back of the build.