top of page

Underfloor Heating


It took us two days to install the underfloor heating on level two. This time, we have left the reo bars in the internal walls sticking up so that we don't have to drill into the slab and risk hitting the heating pipe. This was learned from level one.



Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
  • facebook
  • Twitter Round
  • googleplus
  • flickr

© 2014 Castle Phoenix. Proudly created with Wix.com

bottom of page