top of page

Lounge lintel


We hand mixed fifteen loads of concrete for the level one lintel over the lounge. I mixed and handed it up to Francis on the scaffold. This is a major milestone getting this lintel in. It is the last external wall for this level.



Featured Posts
Recent Posts
Archive
Search By Tags
No tags yet.
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page