Mesh for Second Level Slab
We had a big load of mesh delivered today for the second level slab. This month we made a start laying the first of two layers. We were lucky to have received visitors this day who helped us lift the mesh for the largest room. This area needed nine mm mesh and was incredibly heavy. It took all five of us to manhandle it onto the scaffolding. As it was just we two for the rest of the mesh, we cut each in half and walked them up the stairs.