Started the Lounge Lintel.
This month we made a start on the lintel on the outer wall of the lounge. The two steel posts had to have plates and reo bar welded to their tops. Curving strips of formply had to be cut for the boxing. These strips were supported by acrow props. The first course of bricks was laid across the formply to form the bottom of the lintel.